Changes to Step #14
Edit by Adam Dumas —
Edit approved by Adam Dumas
- Before
- After
- Unchanged
Step Lines
[* black] Slide the bushing onto the point of the needle with the chamfered end towards the back-up screw. | |
- | [* black] |
- | [* black] |
+ | [* black] Put the hoop onto the high-pressure seal with the tapered end towards the high-pressure seal and opposite from the O-ring. |
+ | [* black] Put the high-pressure seal assembly onto the point of the needle with the hoop, first. |