Changes to Step #14
Edit by Adam Dumas —
Edit approved by Adam Dumas
- Before
- After
- Unchanged
Step Lines
- | [* black] Slide bushing onto point of needle with chamfered end towards back-up screw |
---|---|
- | [* black] Place hoop onto |
- | [* black] Place |
+ | [* black] Slide the bushing onto the point of the needle with the chamfered end towards the back-up screw. |
+ | [* black] Place the hoop onto the high-pressure seal with the tapered end towards the high-pressure seal and opposite from the O-ring. |
+ | [* black] Place the high-pressure seal assembly onto the point of the needle with the hoop, first. |