Changes to Step #10
Edit by Adam Dumas —
Edit approved by Adam Dumas
- Before
- After
- Unchanged
Step Lines
- | [* black] Quickly cycle valve on and off a few times to purge system of all contaminats before installing cutting head. |
---|---|
- | [* black] Re-install cutting head and continue cutting process. |
+ | [* black] Apply Blue Goop ([http://www.accustream.com/all-products/11111.html|11111]) to top of nozzle tube. |
+ | [* black] Thread nozzle tube into bottom of valve body. |
+ | [* black] Apply water pressure to valve assembly to verify there are no leaks. |