Changes to Step #10
Edit by Adam Dumas —
Edit approved by Adam Dumas
- Before
- After
- Unchanged
Step Lines
+ | [* black] Apply water pressure to valve assembly to verify there are no leaks. |
---|---|
[* black] Quickly cycle valve on and off a few times to purge system of all contaminats before installing cutting head. | |
[* black] Re-install cutting head and continue cutting process. |