Changes to Step #9
Edit by Adam Dumas —
Edit approved by Adam Dumas
- Before
- After
- Unchanged
Step Lines
+ | [* black] Thread (hand tighten) actuator to top of valve body until it bottoms out. |
---|---|
[* black] Reconnect air line to top of actuator and turn actuator air pressure ON to pull poppet stem up. | |
[* black] Thoroughly clean nozzle tube. | |
- | [* black] Apply Blue Goop ([http://www.accustream.com/all-products/11111.html|11111]) to top of nozzle tube. |