Changes to Step #7
Edit by Adam Dumas —
Edit approved by Adam Dumas
- Before
- After
- Unchanged
Step Lines
- | [* black] Apply |
---|---|
- | [* black] Thread On/Off Valve Screw |
+ | [* black] Apply blue goop to Valve Screw ([http://www.accustream.com/all-products/11218.html|11218]) |
+ | [* black] Thread On/Off Valve Screw into valve body until it bottoms out |
[* black] With dowel rod, push poppet point flush with bottom of bore |