Skip to main content
/

Site Navigation

Your Account

Choose Language

Changes to Step #6

Edit by Adam Dumas

Edit approved by Adam Dumas

Before
After
Unchanged

Step Lines

-[* black] Insert the poppet stem, with the point down, at the top of the valve body.
+[* black] Put the poppet stem, with the point down, at the top of the valve body.
[* black] Use the dowel to push the poppet stem down until the back-up ring is flush with the top of the bore.
[* black] Apply [http://www.accustream.com/all-products/11111.html|Blue Goop] to the top threads of the valve body.