Skip to main content
/

Site Navigation

Your Account

Choose Language

Changes to Step #6

Edit by Adam Dumas

Edit approved by Adam Dumas

Before
After
Unchanged

Step Lines

-[* black] Insert poppet stem, with point down, at top of valve body
-[* black] Use dowel to push poppet stem down until backup ring is flush with top of bore
-[* black] Apply [http://www.accustream.com/all-products/11111.html|Blue Goop] to top threads of valve body
+[* black] Insert the poppet stem, with the point down, at the top of the valve body.
+[* black] Use the dowel to push the poppet stem down until the backup ring is flush with the top of the bore.
+[* black] Apply [http://www.accustream.com/all-products/11111.html|Blue Goop] to the top threads of the valve body.