Changes to Step #5
Edit by Adam Dumas —
Edit approved by Adam Dumas
- Before
- After
- Unchanged
Step Lines
[* black] Insert poppet stem at top of valve body and push with dowel rod until backup ring is flush with top of bore. | |
- | [* black] Screw in On/Off Valve Screw (11218) into the valve body (11144) until it bottoms out. |
+ | [* black] Screw in On/Off Valve Screw ([http://www.accustream.com/all-products/11218.html|11218]) into the valve body ([http://www.accustream.com/all-products/11144.html|11144]) until it bottoms out. |
[* black] Use dowel rod at the bottom of the valve body to push poppet stem's point flush with bottom of bore. |