Changes to Step #5
Edit by Adam Dumas —
Edit approved by Adam Dumas
- Before
- After
- Unchanged
Step Lines
- | [* black] Insert Backup Ring (11143) behind seal and push down until Backup Ring is flush with top of bore. |
---|---|
- | [* black] Load Poppet Stem (11140) into bottom of valve body. |
+ | [* black] Insert poppet stem to top of valve body until backup ring is flush with top of bore. |
[* black] Screw in On/Off Valve Screw (11218) into the valve body (11144) until it bottoms out. |