Changes to Step #12
Edit by Adam Dumas —
Edit approved by Adam Dumas
- Before
- After
- Unchanged
Step Lines
- | [* black] Apply water pressure to valve assembly to verify there are no leaks |
---|---|
- | [* black] Quickly cycle valve on and off a few times to purge system of all contaminats before installing cutting head |
- | [* black] Re-install cutting head and continue cutting process |
+ | [* black] Apply water pressure to valve assembly to verify there are no leaks |
+ | [* black] Quickly cycle valve on and off a few times to purge system of all contaminats before installing cutting head |
+ | [* black] Re-install cutting head and continue cutting process |