Changes to Step #12
Edit by Adam Dumas —
Edit approved by Adam Dumas
- Before
- After
- Unchanged
Step Lines
- | [* black] Apply water pressure to valve assembly to verify there are no leaks |
---|---|
[* black] Quickly cycle valve on and off a few times to purge system of all contaminats before installing cutting head | |
[* black] Re-install cutting head and continue cutting process |