Skip to main content

You're viewing the latest revision of this guide.

Older Newer

Introduction

Hypertherm is in no way affiliated with the above mentioned manufacturer.

  1. Remove the old components from the  plunger end of the high-pressure cylinder with the proper tooling. Remove the  cylinder liner from the high-pressure cylinder. Clean the high-pressure cylinder threads of all Blue Goop with isopropyl alcohol or similar cleaning agent.
    • Remove the old components from the plunger end of the high-pressure cylinder with the proper tooling.

    • Remove the cylinder liner from the high-pressure cylinder.

    • Clean the high-pressure cylinder threads of all Blue Goop with isopropyl alcohol or similar cleaning agent.

  2. Inspect the inside of the high-pressure cylinder, if scratches/galling have occurred, use Scotch Brite or a similar abrasive pad and roll back and forth to each end of the high-pressure cylinder to remove blemishes. Repeat the process (if needed) with 1500 grit abrasive to polish the inside of the bore. Apply high pressure grease to the O-ring.
    • Inspect the inside of the high-pressure cylinder, if scratches/galling have occurred, use Scotch Brite or a similar abrasive pad and roll back and forth to each end of the high-pressure cylinder to remove blemishes.

    • Repeat the process (if needed) with 1500 grit abrasive to polish the inside of the bore.

    • Apply high pressure grease to the O-ring.

  3. Slide the O-ring onto the groove of the high-pressure seal. Put the high-pressure seal into the  dynamic end of the high-pressue cylinder. Put the dynamic seal back-up behind the high-pressure seal.
    • Slide the O-ring onto the groove of the high-pressure seal.

    • Put the high-pressure seal into the dynamic end of the high-pressue cylinder.

    • Put the dynamic seal back-up behind the high-pressure seal.

  4. Put the brass packing follower into the high-pressure cylinder, behind the  dynamic seal back-up.
    • Put the brass packing follower into the high-pressure cylinder, behind the dynamic seal back-up.

    • Continue to static seal assembly. If complete, reassemble the high-pressure cylinder into the intensifier assembly.

Adam Dumas

Member since: 05/20/2013

36 Guides authored